• Skip to primary navigation
  • Skip to main content
  • Skip to footer
TW Construction logo — green and black

TW Construction

Maryland General Contractor

  • About
    • History
    • Leadership
    • Markets
    • Safety
  • Services
    • Pre-Construction Planning
    • Design Build Collaboration
    • General Contracting
    • New Construction
    • Renovations
    • Tenant Interiors
  • Portfolio
  • Resources
    • Affiliations
    • Careers
    • News
    • Subcontractors
  • Privacy Policy
  • Terms Of Use
  • EEO
  • 301.770.2275

Category : Retail

Freestate Shopping Center Retail Stores

Our Project
  • This large-scale revitalization of an aging shopping center to a contemporary retail center involved new storefront facades, roofs, HVAC systems, electric and water service, loading docks and storeroom extensions for each retailer.
  • Major national chains Office Depot, TJ Maxx and Ross Dress for Less were among the retailers served in the center, and recognized TW for its seamless, thorough construction process.
Why Therrien Waddell?
  • TW’s prior work with the property owner demonstrated a proven ability to accomplish successful planning, pricing and scheduling.
  • As construction manager at risk, TW initially delivered preliminary estimates for lease and development strategies. This exemplary work led to negotiated agreements to perform the construction phase of the project.
  • TW was subsequently selected to complete other retail center renovations—including King’s Crossing, Pike Plaza, Lakeforest Shopping Center and Jared Jewelers—as a result of the trust built with the owner.
Challenges and Results
  • This shopping center was open for business. TW implemented strict traffic control measures to maintain the flow of construction and shopping access, preserving safety and access for everyone.
  • TW interacted directly with multiple new retail representatives and achieved all of their staggered deadlines.
  • The scope of work required completing a domestic water service loop to the shopping center.  This was achieved by installing a 10-foot water line (sleeved under a major four-lane, dual highway and intersection) to the site. Safety and access were successfully accomplished without incident.
Project Location
Bowie, MD
Scope
Interior Renovation
Size
135,700 SF
Client
JBG Rosenfeld Retail Properties
Architect
John Cooney Associates

Subcontractors

Great Partnerships build great projects. The outcome of projects can only be as good as the people who make them happen. This is why TW Construction puts a high premium on creating lasting Subcontractor Relationships — the kind of relationships founded and sustained on quality, honesty, and professionalism.

Related Projects

Hughes Network Systems

Retail

Crystal Rock Office Building

Retail

Somerset Pool

Retail

What Our
Partners Say

It is a pleasure working with your project manager. He exercised diplomacy and was always making efforts to satisfy the customer. Issues were fairly resolved and without nonsense. [ Project details ]

Bill Brown — Home Properties

All
Testimonials

Building Partners
for Life

For more than three decades, the TW Construction team has built exceptional projects and durable industry partnerships in the metropolitan Washington, DC-Baltimore region-the kind that are forged from shared experiences and tempered by the bond of persisting through the hard times and the good times. Call us at 301.770.2275

Start the Conversation

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Footer

TW Construction logo — footer black

820 W. Diamond Ave., Suite 220

Gaithersburg, MD 20878

301.770.2275

 / Contact Us

  • About
  • Services
  • Markets
  • Subcontractors
  • Project Portfolio
  • Resources
  • Leadership
  • Safety
  • Careers
  • News
  • History
  • Affiliations
  • Privacy Policy
  • Terms Of Use
  • EEO

© 2023 TW Construction